Water changes the way a place feels.+964 750 410 7076
IRAQFOUNTAIN
All chapters
LIBRARY · FULL TEXT

Project survey form

Read directly in English3 min read4 tables

Project survey form

Form code: F-03 Edit: …… | Date of visit: ……

3–1. General information

title

Information

Project name and code

……

employer and technical representative

……

Address and location coordinates

……

The harvester and the side

……

Project stage

Idea / design / execution / renovation

The use of the place

Square / Park / Commercial Center / Area / Other

The desired type of fountain

……

The main goal

Landscape / Display / Interaction / Event / Other

Primary users

……

People's contact with water

Allowed and designed / Unauthorized / Needs to be determined

Opening time

……

Budget and scope of commitments

……

3–2. Location and infrastructure information

taken

quantity or condition

unit or degree

The length and width of the usable range

……

meters / map

Base level and height difference

……

m

Dimensions and depth of the existing pond

……

m

The condition of the existing structure and sealing

……

Report / photo

Buried facilities and sanctuaries

……

Requested map

Water source and supply capacity

……

cubic meters per hour

Source water test results

……

Report number

Available electricity and allocable capacity

……

Volts / phase / kVA

The location of the board and the distance to the equipment

……

m

Engine room or tank location

……

plan / section

Evacuation path and its limitation

……

Map / Permit

Heavy equipment transfer route

……

Useful width and height

Service and repair route

……

Map

Wind conditions and information sources

……

data / view

Radiation, shade and the possibility of freezing

……

Climate data

The nearest sound-sensitive building

……

Distance and usage

Walking and riding trails

……

Map

Main points of observation

……

Photo number

Access for people with limited mobility

……

Description of the situation

3–3. Display and operating requirements

question

The employer's response

What are the daily and seasonal working hours?

……

Need music or a sound system?

……

What is the desired show?

……

What are the colors or limits of visual identity?

……

Need local or remote control?

……

Is there a fixed operator?

……

Who is responsible for supplying consumables and parts?

……

What is the annual operating cost limit?

……

What is the limit of water or energy consumption?

……

What is the criterion for accepting the appearance of the show?

……

3–4. Open cases and documents

Uncertain topic

Effect on design

responsible for answering

due date

……

……

……

……

……

……

……

……

Attachments of visit: location map □ photos □ water test □ electrical information □ facility inquiry □ meeting minutes of employer's requests □

Signature of the withdrawer: …… Confirmation of information declared by the employer: …… Date of completion of open cases: ……

About this edition

The supplied book has been transferred into website pages, including tables, equations and footnotes. The initial translation was machine generated, with terminology corrections and sample checks; a complete human technical review has not yet been performed. The diagrams have been recreated for the web with labels in the selected language.