Project survey form
Form code: F-03 Edit: …… | Date of visit: ……
3–1. General information
title | Information |
|---|---|
Project name and code | …… |
employer and technical representative | …… |
Address and location coordinates | …… |
The harvester and the side | …… |
Project stage | Idea / design / execution / renovation |
The use of the place | Square / Park / Commercial Center / Area / Other |
The desired type of fountain | …… |
The main goal | Landscape / Display / Interaction / Event / Other |
Primary users | …… |
People's contact with water | Allowed and designed / Unauthorized / Needs to be determined |
Opening time | …… |
Budget and scope of commitments | …… |
3–2. Location and infrastructure information
taken | quantity or condition | unit or degree |
|---|---|---|
The length and width of the usable range | …… | meters / map |
Base level and height difference | …… | m |
Dimensions and depth of the existing pond | …… | m |
The condition of the existing structure and sealing | …… | Report / photo |
Buried facilities and sanctuaries | …… | Requested map |
Water source and supply capacity | …… | cubic meters per hour |
Source water test results | …… | Report number |
Available electricity and allocable capacity | …… | Volts / phase / kVA |
The location of the board and the distance to the equipment | …… | m |
Engine room or tank location | …… | plan / section |
Evacuation path and its limitation | …… | Map / Permit |
Heavy equipment transfer route | …… | Useful width and height |
Service and repair route | …… | Map |
Wind conditions and information sources | …… | data / view |
Radiation, shade and the possibility of freezing | …… | Climate data |
The nearest sound-sensitive building | …… | Distance and usage |
Walking and riding trails | …… | Map |
Main points of observation | …… | Photo number |
Access for people with limited mobility | …… | Description of the situation |
3–3. Display and operating requirements
question | The employer's response |
|---|---|
What are the daily and seasonal working hours? | …… |
Need music or a sound system? | …… |
What is the desired show? | …… |
What are the colors or limits of visual identity? | …… |
Need local or remote control? | …… |
Is there a fixed operator? | …… |
Who is responsible for supplying consumables and parts? | …… |
What is the annual operating cost limit? | …… |
What is the limit of water or energy consumption? | …… |
What is the criterion for accepting the appearance of the show? | …… |
3–4. Open cases and documents
Uncertain topic | Effect on design | responsible for answering | due date |
|---|---|---|---|
…… | …… | …… | …… |
…… | …… | …… | …… |
Attachments of visit: location map □ photos □ water test □ electrical information □ facility inquiry □ meeting minutes of employer's requests □
Signature of the withdrawer: …… Confirmation of information declared by the employer: …… Date of completion of open cases: ……